同城附近喝茶网,杭州大圈品茶工作室,成都喝茶海选工作室

Chinese  |  English
Home  >  News  >  Staff CornerStaff Corner
Priority selection simultaneously with the installation quality of the machinery and equipment renta
News Source:TieTong   Date:2014/9/20 15:22:46   Hit:2311
Construction elevator selection and leasing, construction elevator selection. Qualified product selection ensures the product quality, excellent performance, complete safety devices, safety technical file integrity of the well-known enterprises or large enterprises. It is strictly prohibited to use a construction elevator in any of the following circumstances: first the national clear provisions are not allowed to use or have been eliminated. II have not in conformity with the technical safety standards, or after use period. The inspection found not in conformity with the provisions of security technology standard. There's no complete safety technical archives. The not complete and effective safety protection device. Construction lift rental. Rental unit shall have the corresponding qualifications, good reputation, sound management, managers, operators have the corresponding qualification certificate; and should be the preferred option also has the installation quality of the machinery and equipment rental units. Rental units must be and the signing of a lease contract and safety management agreement, both sides clear safety responsibility and obligation.
Construction elevator installation, disassembly and acceptance of construction elevator installation, disassembly and inspection management is the key link in the entire process management, must be strictly. The first construction elevator installation unit should have the administrative department in charge of Construction issued the work safety license contract specialized lifting equipment installation engineering quality and construction enterprise, safety management, management mechanism to ensure a sound system, safety management system etc.. Secondly, the installation unit must work strictly according to the special construction plan approval, perform their respective duties strictly according to the contract and the relevant provisions. Infrastructure construction. Should strictly implement the relevant specifications, the special plan approval and product instructions for use in construction of foundation, and press the "building construction elevator installation, use, removal specifications safety" (JGJ215-2010) on the basis of acceptance, qualified acceptance can install rear. This is a very critical step, will directly affect the back construction elevator installation, use, remove the safety.
主站蜘蛛池模板: 广东省| 阿尔山市| 凯里市| 玛纳斯县| 奉化市| 呼和浩特市| 曲阜市| 永康市| 正蓝旗| 牡丹江市| 凉山| 云梦县| 尖扎县| 麟游县| 临夏县| 鹤峰县| 许昌市| 余江县| 阿拉善右旗| 瓦房店市| 辽源市| 仁怀市| 长丰县| 开平市| 青田县| 宁陕县| 稷山县| 福鼎市| 砀山县| 丰宁| 德阳市| 古丈县| 佳木斯市| 吴旗县| 灌南县| 花垣县| 大英县| 游戏| 屯门区| 泸水县| 淮阳县|